Directions to Solve

In each of the sentences given below a word is printed in bold. Below it four choices are given. Pick up the one which is most nearly the same in meaning as the word printer in bold and can replaces it without altering the meaning of the sentence.

Q1: It took him a long time to come round after the operation.

A recover

B eat

C walk

D move

Q2: Break even point is the point where

A sales revenue and total expensive lines intersect

B variable and total cost lines intersect

C fixed and variable cost lines intersect

D fixed and total cost lines intersect

Q3: In a thermal power plant, coal from the coal handling plant is moved to the boiler bunker through a

A overhead crane

B fork lift truck

C bucket conveyor

D belt conveyor

Q4: When slack of an activity is positive

A it represents that a programme falls behind schedule and additional resources are required to complete the project in time

B any one of the above

C the activity is critical and any delay in its performance will delay the completion of whole project

D it represents a situation where extra resources are available and the completion of project is not delayed

Q5: For a small scale industry, the fixed cost per month is Rs. 5000. The variable cost per product is Rs. 20 and sales price is Rs. 30 per piece. The break even production per month will be

A 500

B 300

C 460

D 1000

Q6: Follow-up prescribes the sequence of operations to be followed.

A Correct

B Incorrect

Q7: Dummy activities are used to

A none of these

B maintain the required net work

C determine the project completion time

D determine the critical path

Q8: Which of the following statement is wrong?

A An event is an instantaneous point in time at which an activity begins or ends.

B The performance of a specific task is called an activity.

C The turning of a job on lathe is an event whereas job turned is an activity.

D An activity consume time and resources whereas an event do not consume time or resources.

Q9: If F is the fixed cost, V is the variable cost per unit (or total variable costs) and P is the selling price of each unit (or total sales value), then break even point is equal to

A

B

C

D

Q10: CPM stands for

A Critical Path Method

B Critical Process Method

C Common Planning Method

D Combined Process Method