Estimating and Costing - Engineering
Q1: A cement concrete road is 1000 m long, 8 m wide and 15 cm thick over the sub-base of 10 cm thick gravel. The box cutting in road crust isA
500 m3
B
1000 m3
C
1500 m3
D
2000 m3
ANS:C - 1500 m3 Quantity of cc road = 1000*8*0.15 = 1200 cum. |