Docks and Harbours - Engineering

Q1:

A lead line or sounding line

A is stretched thoroughly when wet before it is graduated

B should be soaked in water for about one hour prior to taking soundings

C is adjusted at regular interval

D is generally used for depths exceeding 6 m

E all the above.

ANS:E - all the above.

No answer description is available.