- Waste Water Engineering - Section 1
- Waste Water Engineering - Section 2
- Waste Water Engineering - Section 3
- Waste Water Engineering - Section 4
- Waste Water Engineering - Section 5
- Waste Water Engineering - Section 6
- Waste Water Engineering - Section 7


Waste Water Engineering - Engineering
Q1: Bottom openings 15 cm x 15 cm in the standing baffle wall are providedA
15 cm c/c
B
22.5 cm c/c
C
30 cm c/c
D
50 cm c/c.
ANS:B - 22.5 cm c/c The notation "c/c" stands for "center to center," indicating the distance between the centers of adjacent openings. Given that the bottom openings in the standing baffle wall are 15 cm x 15 cm, we need to determine the distance between the centers of these openings. The correct option would be the one that provides the distance between centers of adjacent openings as per the provided dimensions. For a 15 cm x 15 cm opening, the distance between the centers of adjacent openings should be calculated as follows:
|


For help Students Orientation
Mcqs Questions
One stop destination for examination, preparation, recruitment, and more. Specially designed online test to solve all your preparation worries. Go wherever you want to and practice whenever you want, using the online test platform.