Highway Engineering - Engineering

Q1:

During last phase of the reconnaissance, details of the grade line is recorded on 2 metre poles to indicate

A direction of the proposed alignment

B distance between the previous and forward pegs

C relative elevations of pegs

D all the above.

ANS:D - all the above.

No answer description is available.