Surveying - Engineering

Q1:

If h1 and h2 are the differences in level between ground and the formation levels, m is the slope of the sloping sides. D is the distance between the cross sections then, prismoidal correction for a level section is

A D/2m(h1 - h2)

B D/3m(h1 - h2)

C D/6m(h1 - h2)2

D D/6m(h1 - h2)3

E D/6m(h1 + h2)2

ANS:C - D/6m(h1 - h2)2

No answer description is available.