Steam Boilers and Engines - Engineering

Q1:

In a compound steam engine, the first stage of expansion is carried out in a high pressure cylinder whereas the last expansion is completed in low pressure cylinder. The diameter of high pressure cylinder is __________ the lowpressure cylinder.

A equal to

B less than

C more than

ANS:B - less than

Explanation: No answer description is available.