Q1: In instrument landing systemA L.O.M. and L.M.M. are installed on one side and Localizer antenna on the other side
B
L.O.M. and Localizer are installed on one side and L.M.M. on the other side
C Localizer and L.M.M. are installed on one side and L.O.M. on the other side
D
None of these.
ANS:A - L.O.M. and L.M.M. are installed on one side and Localizer antenna on the other side No answer description is available. |