Industrial Engineering and Production Management - Engineering

Q1:

P.M.T.S. (Predetermined Motion Time Systems) include

A M.T.M. (Method Time Measurement)

B W.F.S. (Work Factor Systems)

C B.M.T.S. (Basic Motion Time Study)

D all of these

ANS:D - all of these

Explanation: No answer description is available.