Airport Engineering - Engineering

Q1:

Pick up the correct statement from the following:

A The centre line of the approach area coincides with that of the runway

B Approach areas are measured in horizontal surfaces

C The imaginary inclined plane which is directly above the approach area is called approach surface

D Obstruction clearance surface and approach surface are same

E All the above.

ANS:E - All the above.

No answer description is available.