Engineering Economy - Engineering

Q1:

Pick up the main purpose of project cost control from the following :

A To signal immediate warning of uneconomic operations

B To provide a feed back to the estimator

C To promote cost consciousness

D All of these

ANS:D - All of these

No answer description is available.