Structural Design Specifications - Engineering
Q1: Removal of props underA
slabs spanning upto 4.5 m is 7 days
B slabs spanning more than 4.5 m is 14 days
C beams spanning upto 6 m is 14 days
D beams spanning more than 6 m is 21 days
E
all the above.
ANS:E - all the above. No answer description is available. |