Estimating and Costing

Q1: The brick work is measured in sq metre, in case of

A Honey comb brick work

B Brick flat soling

C Half brick walls or the partition

D All the above.

ANS:D - All the above.

The first layer is layed with brick gaps.

2nd layer is made by covering the top of the gap.