Q1: The construction manager uses the estimate of the projectA
to tell the owner of the project to take his/her financial decision.
B
to advise the architect/engineer regarding design cost parameter especially in value engineering analysis.
C
to develop bids on the project.
D
to control the project during its construction.
E
All of these
ANS:E - All of these No answer description is available. |