Q1: The construction manager uses the estimate of the project

A to tell the owner of the project to take his/her financial decision.

B to advise the architect/engineer regarding design cost parameter especially in value engineering analysis.

C to develop bids on the project.

D to control the project during its construction.

E All of these

ANS:E - All of these

No answer description is available. 