Estimating and Costing - Engineering
Q1: The expected out turn for earth work in excavation in ordinary soil per mazdoor per day isA
1.00 cubic meter
B
2.00 cubic meter
C
3.00 cubic meter
D
4.00 cubic meter
ANS:C - 3.00 cubic meter As per I know it's 2.27 for ordinary soil. |