Building Materials - Engineering

Q1:

The initial setting time of lime-pozzolana, is

A 30 minutes

B 60 minutes

C 90 minutes

D 120 minutes.

ANS:D - 120 minutes.

The initial and final setting time of RHC is 5 mins and 30 mins respectively.