- Waste Water Engineering - Section 1
- Waste Water Engineering - Section 2
- Waste Water Engineering - Section 3
- Waste Water Engineering - Section 4
- Waste Water Engineering - Section 5
- Waste Water Engineering - Section 6
- Waste Water Engineering - Section 7


Waste Water Engineering - Engineering
Q1: The normal value of over flow rates for plain primary sedimentation tanks, ranges betweenA
25, 000 to 35, 000 litres/sqm/day
B
40, 000 to 50, 000 litres/sqm/day
C
50, 000 to 60, 000 litres/sqm/day
D
80, 000 to 100, 000 litres/sqm/day
E
none of these.
ANS:B - 40, 000 to 50, 000 litres/sqm/day A range of 40,000 to 50,000 liters per square meter per day (liters/sqm/day) refers to the overflow rate in plain primary sedimentation tanks. This parameter is crucial in wastewater treatment as it determines the hydraulic loading on the sedimentation tank and influences the efficiency of solid-liquid separation. Here's an explanation of the significance of this overflow rate range:
|


For help Students Orientation
Mcqs Questions
One stop destination for examination, preparation, recruitment, and more. Specially designed online test to solve all your preparation worries. Go wherever you want to and practice whenever you want, using the online test platform.