GATE Exam Questions - Engineering

Q1:

Water distribution systems are sized to meet the

A maximum hourly demand

B average hourly demand

C maximum daily demand and fire demand

D average daily demand and fire demand.

ANS:C - maximum daily demand and fire demand

The Distribution System should be designed for the maximum hourly draft of maximum day or coincident (Maximum daily draft) with fire, whichever is more.