Q1: What is the significant purpose of monitoring a project through its implementation phase ?

A To fix responsibility for delays

B To revalue the project with control over cost over-run

C To revalue the project with minimum time over-run

D To revalue the project with optimal time and cost over-run

ANS:D - To revalue the project with optimal time and cost over-run

Option C should be the correct answer.