Q1:

Which method is adopted to develop an approximate or conceptual estimate for perimeter works for buildings from the following:

A Base unit method

B Cost per function method

C Cost per square metre method

D Cost per cubic metre method

E Cost per linear metre method

ANS:E - Cost per linear metre method