Q1: Work sampling is applied forA estimation of the percentage utilisation of machine tools
B estimating the percentage of the time consumed by various job activities
C finding out time standards, specially where the job is not repetitive and where time study by stop watch method is not possible
D all of the above
ANS:D - all of the above Explanation: No answer description is available. |