image not found

Oops! That page can't be found.


Directions to Solve

In each of the sentences given below a word is printed in bold. Below it four choices are given. Pick up the one which is most nearly the same in meaning as the word printer in bold and can replaces it without altering the meaning of the sentence.

Q1: No one will invite her to a tea party for she is so garrulous.

A talks a lot

B laughs a lot

C repeats gossip

D giggles all the time

Q2: A systematic job improvement sequence will consist of

A motion study

B time study

C job enrichment

D all of these

Q3: Work sampling is applied for

A all of the above

B finding out time standards, specially where the job is not repetitive and where time study by stop watch method is not possible

C estimation of the percentage utilisation of machine tools

D estimating the percentage of the time consumed by various job activities

Q4: Military type of organisation is known as

A line, staff and functional organisation

B functional organisation

C line organisation

D line and staff organisation

Q5: When slack of an activity is negative

A it represents that a programme falls behind schedule and additional resources are required to complete the project in time

B all of the above

C it represents a situation where extra resources are available and the completion of project is not delayed

D the activity is critical and any delay in its performance will delay the completion of whole project

Q6: The procedure of modifying work content to give more meaning and enjoyment to the job by involving employees in planning, organisation and control of their work, is termed as

A job enrichment

B job rotation

C job enlargement

D job evaluation

Q7: Fixed position layout is also known as

A analytical layout

B none of these

C synthetic layout

D static product layout

Q8: In a network shown in the below figure, the critical path is along

A 1-2-3-4-8-9

B 1-2-3-4-7-8-9

C 1-2-5-6-7-8-9

D 1-2-3-5-6-7-8-9

Q9: Bar chart is suitable for

A major work

B all of these

C minor work

D large project

Q10: Which one of the following chart gives simultaneously information about the progress of work and machine loading?

A Process chart

B Gantt chart

C Machine load chart

D Man-machine chart