Production Engineering

Q1: The time (in minutes) for a drilling a hole is given by

where h is the

A length of the drill

B drill diameter

C flute length of the drill

D cone height of the drill

ANS:D - cone height of the drill

Explanation: No answer description is available.



img not found
img

For help Students Orientation
Mcqs Questions

One stop destination for examination, preparation, recruitment, and more. Specially designed online test to solve all your preparation worries. Go wherever you want to and practice whenever you want, using the online test platform.